Saturday, October 10, 2009

Serious Framing Progress!

The progress continued over the weekend. The fellas came in with some serious framing in mind!

Besides the frames for our Machine Room, all framed walls went up today! It felt good being able to walk into each room and imagine what's to come. Although the framed walls are only one step of this lengthy detailed process, it sure does feel like progress is being executed! That's what counts!

Dave Hampton has been monitoring progress and development via phone and this blog. He's currently in New York at AES.


Drywall being applied to inside of Studio "A" vocal booth (first wall layer).

Drywall being applied to exterior of Studio "A".
Inside shots of Studio "A".



Looking into Studio "A" from vocal booth.

Carefully checking wall leveling.
Drywall being applied to exterior of "Studio" A (entrance side).


Ceiling joists being cut to size.

Looking down hallway past Studio "A", towards Radio Production Room.

Installation of partitioning wall between Radio Production Room & BeatBox Pros Showroom.
Radio Production Room
BeatBox Pros Showroom
Ceiling joists installed in Studio "A".

First layer of exterior drywall on Studio "A".

The boys called it a day after some serious progress. Time to go home to the family, throw down some carne asada and a couple cold ones. Back to business as usual on Monday!




No comments:

Post a Comment