Today was a big day. Fortunately everything went well for us and we passed our first framing inspection!

The downside was that the construction crew didn't show up, and I ended up doing all the work today. See pictures below:


It started off mellow, nice & easy.....

Then I had to get down to the nitty gritty with the power tools......

Then, I had to take some precise measurements....

......a little cleanup here and there.....

....a little back-stretching work....

...back to the nitty gritty......

...I was fatiguing by this point......

Then I got really tired.......

Just kidding, the crew did show up! I did look kinda cool on those action shots though. LOL!

Here are the pictures of the real progress. We had some more partitioning walls go up in Studio "B" and Studio "C". The crew also stuffed the "suite dividing" wall with insulation, and most importantly, we passed our first inspection!

Partitioning wall between Studio "B" and vocal booth.

Suite dividing wall stuffed with insulation.

Wall on left is Studio "C" and it's vocal booth is in front of it.



Other angle of Studio "B" and vocal booth

Anchoring Studio "B" walls to concrete with nail gun.