Friday, October 23, 2009

Studio C, Lounge Bar & HVAC Progress

HVAC ducts being ran through hallway





Studio C compression sub-ceiling being framed

DJ booth takes form in "Radio Room"




Shots of air conditioning/heating in the "Radio Room" & "BeatBox Pros" office.


AC/heat vent in Studio A vocal booth


Isaac filling in gaps with acoustic caulking


Construction begins on lounge area bar




No comments:

Post a Comment